Raytheon s-a apucat si de radarele noastre

Direct de la sursa:

„Raytheon IDS, Andover, Massachusetts, was awarded a $395,847,480 modification (P00026) to foreign military sales (Romania) contract W31P4Q-15-C-0022 for Phased Array Tracking on Radar to Intercept Option Fire Unit (PATRIOT = Phased Array Tracking Radar to Intercept On Target), adica unitatea de tragere (baterie) Patriot:

Patriot fire system

PATRIOT Fire Unit

… sau asa cu alta grafica… si cu specificarea tipului de interceptor

 

Work will be performed in Andover, Massachusetts; Pelham, New Hampshire; Tewksbury, Massachusetts; Marlborough, Massachusetts; McKinney Texas; Portsmouth, Rhode Island; Chambersburg, Pennsylvania; and Burlington, Massachusetts, with an estimated completion date of April 30, 2020. Fiscal 2018 foreign military sales funds in the amount of $244,088,179 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.”

Cat despre radar, sa nu ne emotionam, ca este tot cel clasic AN/MPQ-53 cu mici imbunatatiri (radar digital processor/RDP: putere marita + banda de cautare extinsa), pe cand noul 360°/GaN este inca in dezvoltare

In principiu, anul viitor prima baterie Patriot va sosi in Tara, urmand ca in anul „douazeci-douazeci” 🙂 sa devina si operationala.

Sa ne ajute Dumnezeu sa le vedem pe toate in serviciul operativ de lupta.

Desi nu la fel de important, se umbla si la rachetele AMRAAM pe care Romania le va primi  (din cate stiu eu inca n-au sosit in Tara), astfel:

„Raytheon Missile Co., Tucson, Arizona, has been awarded a $12,099,569 fixed-price-incentive contract modification (P00004) to previously awarded contract FA8675-18-C-0003 for Advanced Medium Range Air to Air Missile (AMRAAM) Production Lot 32 field spares and initial depot spares.  Work will be performed in Tucson, Arizona, and is expected to be complete by Jan. 31, 2021.  This modification involves foreign military sales to Australia, Korea, Qatar, Romania, Saudi Arabia, Singapore, and Turkey.  Fiscal 2018 production funds in the amount of $4,840,654; fiscal 2018 research and development funds in the amount of $477,392; fiscal 2018 operations and maintenance funds in the amount of $196,793; and foreign military sales funds in the amount of $6,584,730 are being obligated at the time of award.  Air Force Life Cycle Management Center, Air Dominance Contracting Office, Eglin Air Force Base, Florida, is the contracting activity.”

Sursa AICI

Nu pare chiar mare lucru, fiind vorba la prima vedere doar de niste de piese de schimb, aflam insa din alta sursa ce fac americanii mai exact in cadrul Lotului 32 si lucrurile par mai complexe, mai exact s-a modificat contractul “din drum” pentru a mari capabilitatea C7 – deci Lot 32.: „AMRAAM lot 32 is expected to the first batch of production missiles that integrate the Form, Fit, Function Refresh (F3R) of the AMRAAM guidance section. The Air Force’s AMRAAM F3R project is a comprehensive effort to mitigate the effects of parts obsolescence and diminishing manufacturing sources in the missile’s guidance section to enable AMRAAM production beyond lot 31.”

Mai departe puteti citi direct de la sursa. De remarcat ca rachetele AMRAAM AIM 120 C6 cumparate de Romania au trecut deja sau sunt in curs de modernizare la standardul „D” cu exceptia razei care nu va fi la fel de mare precum la  varianta „D”.

PS De-a lungul timpului am mai fost intrebat de unde stiu ca noi am cumparat C6, iar raspunsul ar fi ca americanii nu mai au in stocuri variante inferioare, cum ar fi C5, C4 etc…

PPS Poate ca v-ati plictisit sa tot anuntam ca rachetele PAC 3MSE au intrat in productie, HIMARS, acum radarul, AMRAAM la modernizare, dar, in principiu, stam cu ochii pe americani ca doar le-am dat banii 🙂 , pe de alta parte stim cum stam.

GeorgeGMT

35 de comentarii:

  1. George tu ce parere ai despre M109?

  2. Ce bine suna: „Raytheon s-a apucat si de radarele noastre” :). Dupa 2026 probabil ca o sa achizitionam si noul radar.

    Referitor la artileria autopropulsata, chiar daca luam K9, Archer, Pz 2000, ATROM sau alte bunatati… trebuie sa ne gandim si la Excalibur, Bonus, Vulcano etc.

  3. Care e treaba cu raza inferioara a rachetei in cazul Romaniei? De ce? E vorba de vreo cenzura?

  4. Foarte bine.
    Asa anul urmator avem o baterie de Patriot in tara. Cu toate cele necesare. Evident , undeva sa poata apara Deveselu.
    Se tot vorbeste de autotunuri ( obuziere)
    Un regiment de artilerie ar avea nevoie de:
    – un batalion Himars
    – un batalion Larom modernizat
    – un batalion de obuziere calibru 155 mm si de preferat autopropulsate. + radar controbaterie.
    Nu am mentionat unitatile auxiliare dar la fel de importante.
    Cu 3 regimente astfel dotate , avem o artilerie credibila , cu foarte buna mobilitate .
    Cu ce dotezi batalionul de obuziere , e o lunga analiza cu pro sau contra pentru fiecare tip de ” scula”.
    Onorabilii cititori trebuie sa inteleaga ca in 2018 , armata romana NU ARE nici macar un obuzier calibru standard NATO de 155 mm.

  5. ATROM 155 mm facut de Aerostar Bacau cu evrei…ATMOS pe camion DAC 6×6 ….personal as incerca cooptarea Rheinmetall pt modernizarea Roman Brasov,partea militara,tot Man sunt ca si alea lu Ceausescu astea fiind ultima generatie….
    https://cdn.pressebox.de/r/31d95abf86e4d410/attachments/65/92/38/thumbnail_659238_495x300.jpg

  6. Si tunul se poate face in Romania…vb cu nea Vasile…sper ca stiti de dansul…

  7. In sfarsit o stire buna.Incet si sigur de dotam corespunzator, Doamne ajuta, referitor la ce ne mai trebuie, aici ar fi de scris un pomelnic lung foarte lung.

  8. „Work will be performed in Andover, Massachusetts…and Burlington, Massachusetts, with an estimated completion date of April 30, 2020.”
    „In principiu, anul viitor prima baterie Patriot va sosi in Tara, urmand ca in anul „douazeci-douazeci” ? sa devina si operationala.”
    Cineva, sau ceva, se bate cap in cap…
    Parerea mea, hic…

    • Eu vorbesc din zvonuri, Raytheon stie exact ce spune.

    • Este un contract cadru – indefinite delivery indefinite quantity (IDIQ) unde se lucreaza la mai multe „elemente” in acelasi timp. Atunci astia de la Raytheon estimeaza ca isi vor termina munca bazat pe livrarile finale pentru ce a fost/vor fi platiti. Nu cred ca eie au estimat ca in 20twenty vor livra o baterie.

      • Ai inteles gresit.
        Contractul de baza e cu USArmy. Timp indefinit , produse in numar nespecificat. ( dupa necesitati).
        Cind o tara straina face contract cu guvernul american pentru aceleasi produse militare si plateste avansul , USArmy suplimenteaza contractul de baza. In cazul specific , cu 395 milioane dolari pentru contractul cu Romania. Pret fix , data certa de livrare a produsului.
        Identic si cu cele 12 milioane suplimentare pt rachetele AMRAAM. Aici in schimb, tinand cont ca e o suplimentare pentru mai multi clienti straini, e evident ca se refera la piese de schimb , intretinere a rachetelor deja existente in arsenalul respectivilor clienti. Nu cumpara nimeni doar 2- 3 rachete noi.

        • Care data certa de livrare a produsului? Sunt mai multe „produse,” iarn data respectiva este data estimata de Raytheon cand vor termina munca pentru ordinul de cerinte (task order) emis de US Army pentru Romania.

          • Timpul aproximativ de livrare , 30 aprilie 2020.
            Ce induce in eroare , faptul ca nu e specificat AL CATELEA RADAR e asta pentru Romania.
            Fiecare din cele 7 sisteme are radarul lui.
            Deci , e al doilea , al treilea radar?
            Ca primul vine cu prima baterie in 2019.. Deci 2020 ar fi bateria ( si radarul) numarul 2.

Lasă un răspuns

Adresa ta de email nu va fi publicată. Câmpurile obligatorii sunt marcate cu *